24-Hour Injection Mold Quote: The Five Inputs Engineers Must Send

24-Hour Injection Mold Quote: The Five Inputs Engineers Must Send

← Back to Blog · 24-Hour Injection Mold Quote: The Five Inputs Engineers Must Send

By Jack, tooling and molding team, Hongqiang Mould | 2026-11-20 | 6 min read

A 24-hour injection mold quote is a promise about a complete RFQ, not about a bare email. Five inputs decide whether the clock starts the day you send it or three days later: a 3D model, a 2D drawing with critical tolerances, a target resin, an annual volume, and the surface expectation on the cosmetic face. Send those five and a toolroom can return a number. Leave two of them out and the fastest honest answer is a question.

Key takeaways

  • The quote clock starts when the RFQ is complete, not when the message lands in an inbox.
  • Five inputs let a toolmaker price the work: 3D model, 2D drawing with critical tolerances, target resin, annual volume, and surface expectation.
  • Complex programs may need one more working day for DFM review beyond the standard 24-hour quotation.
  • The roughly 45-day lead time for a small mould starts at drawing review, not at the purchase order.

Which files let a toolroom start on day one?

A STEP or IGES model carries the geometry a toolroom reads first: wall thickness, draft, the likely parting line, and where a gate can sit. A 2D drawing carries something the model usually does not — which dimensions actually matter. Put the critical tolerances on the 2D sheet rather than leaving them implied in the solid. SLDPRT files are accepted, and a PDF of the drawing travels well. Photos of an existing sample part also help, especially when the part has been modified on the shop floor and the model is out of date.

The practical test is simple. If an engineer has to ask you where the cosmetic face is or which hole is functional, the RFQ is not complete yet. Answering those questions by return email costs a day; marking them on the drawing costs five minutes.

Why does annual volume change the quote before steel is chosen?

Volume decides cavity count, and cavity count decides almost everything downstream: the size of the mould base, the grade of steel, the cooling layout, and which press can run the job. A toolroom cannot price a four-cavity tool against a one-cavity brief without guessing, and a guess at this stage becomes a change order later. State the annual quantity even as a range — “around 50,000 per year” is enough to start the conversation.

Our floor runs 11 presses from 80 to 450 T, so the tonnage window is wide, but the right press follows from projected area and cavity pressure, not from part weight. Volume also determines whether a bridge tool makes sense before a production tool is cut. That is a separate decision and worth raising in the RFQ if the program is still ramping.

What does the resin brief decide?

Name the resin grade if you have one; if not, name the family and whether it is filled. We mould PP, PE, ABS, PS, PC, PA, POM, PBT, PET, TPE and TPU. The filler matters more than the family name in one respect: glass-filled and recycled resins wear gates and parting lines differently, which shifts steel selection. Steel certificates and component brands are confirmed in the quotation, so the brief should be specific enough to price the right material rather than a default.

A target material also sets shrink behaviour. If you already have a tolerance map that depends on a particular grade, send both together; a resin substitution after the tool is cut is a much more expensive conversation.

Which two inputs do buyers forget most often?

Surface and tolerance. Surface means which face is cosmetic and what finish it needs. Tolerance means which dimensions are functional, as opposed to nominal dimensions copied from a CAD model. A drawing where every dimension carries a tight tolerance is not a tolerance map; it is a request to quote the worst case. Marking three functional dimensions gives a toolroom something to build against and gives the inspection room something to measure.

Dimensional verification happens in our own CMM room, and reports are prepared to match the customer’s approval workflow when the part goes into an assembly. If your program requires a particular report format, say so at RFQ stage rather than at first article.

What happens inside the 24 hours?

The 24-hour commitment covers the quotation itself: drawing review, a DFM pass where the design needs one, cavity and press selection, steel choice, and a written number. Complex programs may need one more working day for DFM review, and we say so rather than sending a number we cannot hold. What the 24 hours does not include is tool construction. The roughly 45-day lead time on a small mould starts at drawing review, not at the purchase order — the same review that makes a 24-hour quote possible.

What can we not quote from drawings alone?

Existing parts sometimes arrive with no model at all. Send photos and the key dimensions and we will confirm what additional data is needed before quoting. This is slower than a clean STEP file but faster than redesigning a part from a guess. If the part has a history of field failures, mention that too: a known crack line changes the gate and wall discussion more than a perfect drawing does.

Our take

The five inputs are not bureaucracy. Each one removes a branch from the quotation tree. Buyers who send all five get a number they can compare; buyers who send two get a fast reply that is really a request for the missing three. If there is only one thing to add to your next RFQ, make it the 2D drawing with critical tolerances marked — the model describes the part, the drawing describes the requirement.

What we do not know yet

We cannot judge gate position, cycle time, or cavity count from a resin family alone; those need the model and the volume together. We also cannot confirm a surface finish from a photo. Where a brief is thin, we will say which assumption the quotation rests on instead of burying it in the price.

Frequently asked questions

What files should I send with my RFQ?

A STEP or IGES 3D model, a 2D drawing marking the critical tolerances, the target material, the annual volume, and the expected surface finish. Photos of a sample part help. Drawing files in SLDPRT or PDF are also accepted.

How fast will I get a quotation?

Within 24 hours of a complete RFQ. A complex program may take one additional working day when DFM review is required, and we tell you when that applies.

Can you work from a sample part?

Yes. Send photos and the key dimensions with the RFQ and we will confirm what further data is needed before quoting.

Does annual volume change the quotation?

Yes. Volume drives cavity count, which drives steel grade, cooling layout and press selection. An approximate annual range is enough to start.

When does the 45-day mould lead time start?

At drawing review, not at the purchase order. A complete RFQ is what allows the review to happen quickly.

Ready to price a tool? Send the five inputs through our request a quote page and we will return a quotation within 24 hours of a complete RFQ.

Jack is part of the tooling and molding group at Hongqiang Mould, a Chinese injection mould manufacturer serving export buyers. The factory combines DFM and simulation with in-house toolmaking: 5 CNC machining centres, EDM and grinding, 11 presses from 80 to 450 T for trials and production, and CMM inspection in a dedicated metrology room.

Related reading from our tooling guides: bridge tooling vs. production tooling, S136 vs. NAK80 vs. 718H mold steel, and insert molding and overmolding design rules.


Technical Guides

Browse all technical guides →