We help buyers turn part drawings into moulds that cycle fast and stay stable in production. Cooling decides most of that cycle: published industry figures put the cooling stage at 50–70 % of total injection moulding cycle time, and the wall thickness a designer picks months before steel is cut decides most of the cooling. This article assembles the published numbers behind both claims and shows where the seconds actually hide.

Quotations talk about cavities, steel grade and press tonnage. Cycle time rarely gets a line of its own, yet a mould that runs 30 seconds instead of 20 costs the molder a third of the output on the same machine. The buyer pays for that gap across every shipment, long after the mould invoice is forgotten.

One camp treats cooling as the mouldmaker’s job: drill some water lines, hook up a temperature controller, and the press takes care of the rest. The other camp has waited on a molder who blamed a slow cycle on the tool, then measured the coolant circuit and found laminar flow in every line. Both stories are common, and both miss the same point — the biggest cooling decisions are made in part design, not at the press.

The contradiction shows up in every RFQ review. Buyers ask for tolerance figures to two decimal places while the wall thickness on the same drawing varies by half a millimetre between features, and that half millimetre moves cooling time far more than any tolerance on the drawing.

We set out to answer four questions from published sources, cross-checked against each other:

  • What does the cooling-time formula actually fix, and what does it leave open?
  • How much does wall thickness move cooling time, in numbers a buyer can re-run?
  • Which channel layout fits which geometry, and why does the core side dominate?
  • Why does coolant flow beat channel count once the tool is already cut?

The short answer, assembled from two industry media sources and one manufacturing platform: cooling time scales with the square of the wall thickness, most of the heat leaves through the core, and flow rate is the one lever that stays open after the steel is cut. The sections below carry the arithmetic and the sources.

Key takeaways

  • Cycle share: the cooling stage runs 50–70 % of a standard injection moulding cycle, on published industry figures, so cooling choices outweigh almost every other cycle lever.
  • Wall rule: cooling time grows with the square of wall thickness — a 2.0 mm ABS wall calculates to roughly 9.8 s, while 3.0 mm reaches about 22 s from the same formula and material data.
  • Core dominance: roughly 80 % of the heat leaves through the core steel, because the shrinking part pulls onto the core and away from the cavity, which is why deep cores need their own cooling.
  • Flow threshold: coolant must run turbulent — a Reynolds number above roughly 4,000–5,000 — or heat transfer collapses regardless of channel count.
  • Material lever: beryllium copper conducts at 105–130 W/(m·K) against roughly 29 for P20 tool steel, a 3–4× gap used for targeted inserts, not whole cavities.

Methodology

Every figure in this article comes from published documents rather than from a cooling study run on our floor. MoldMaking Technology and Plastics Technology — both industry media with moulding engineers on their bylines — supply the core-side heat share, the Reynolds threshold and the relative conductivity comparison between H13 and P20. Xometry, a manufacturing services platform, supplies absolute thermal conductivity values in W/(m·K) for tool steel and copper alloys. The cooling-time formula is the standard one-dimensional conduction solution used across moulding engineering, and the worked numbers in the first table were calculated from it with published property data for ABS; the arithmetic is shown so any reader can re-run it with their own resin values. Where sources disagree on a threshold, the range is given instead of a single figure. Nothing here should be read as a measurement made in our shop.

Deep black moulded housing with tall internal ribs, the geometry type that decides cooling time
A deep housing of the kind where wall thickness and core cooling set the cycle

What does the cooling-time formula actually fix?

The standard equation treats the part wall as a flat plate cooling from both faces. In its usual form: t = (s² / (π² · α)) · ln[(4/π) · (Tmelt − Tmold) / (Teject − Tmold)], where s is the wall thickness, α is the thermal diffusivity of the resin, and the three temperatures are melt, mould wall and ejection. Two inputs do the work. Wall thickness enters squared, which makes it the dominant term by far. Thermal diffusivity is a material property, so once the resin is fixed, the designer controls the equation through s and through the temperatures the mould can hold.

One worked example makes the scale concrete. Take an ABS enclosure with a 2.5 mm wall, melt at 230 °C, mould surface at 55 °C and ejection at 90 °C. ABS diffusivity near moulding temperatures is about 1.2 × 10⁻⁷ m²/s. The logarithmic term works out near 1.85 and the whole expression gives roughly 9.8 seconds. That figure is a physics floor, not a production setting: the formula assumes symmetrical cooling of a flat plate at a constant mould temperature, and no real tool meets either condition. Pack, fill and ejection time stack on top of it.

But this doesn’t tell the entire picture. Real parts have ribs, bosses and thickness transitions, and the thickest section that must solidify before ejection sets the clock for the whole part — not the average wall the drawing leads with.

How much does wall thickness move cooling time?

Because s enters squared, the table below can be computed once and read forever. The middle column is the square of the wall relative to 2.0 mm; the last column applies the same ratio to the 9.8-second ABS floor calculated above.

Wall thicknessRelative s²Cooling floor, same ABS case
1.0 mm0.25≈ 2.4 s
1.5 mm0.56≈ 5.5 s
2.0 mm1.00≈ 9.8 s
2.5 mm1.56≈ 15.3 s
3.0 mm2.25≈ 22.0 s
4.0 mm4.00≈ 39.2 s

Read one row against the next. Going from 2.0 mm to 3.0 mm adds half a millimetre of steel on the drawing and adds 12 seconds to the floor of every cycle.

Thick walls also feed the defect list. A section that freezes late holds the pack pressure longer, which is where sink marks and voids come from, so the same half millimetre costs quality as well as time.

The lever works in both directions. A designer who takes a 3.0 mm wall to 2.5 mm cuts the cooling floor by roughly 31 % without touching the mould, the resin or the press — a change worth pursuing before any conversation about conformal cooling or copper inserts.

Two moulded housing halves with internal ribs and bosses laid side by side
Housing halves where rib and boss thickness decide the cooling floor

Which channel layout fits which geometry?

Straight-drilled channels remain the default. Published practice puts channel diameter at 8–14 mm and the channel centre at roughly 1.5–2.5 diameters from the cavity surface — close enough to pull heat, far enough to keep the steel strong and the surface from cracking under thermal stress. Closer is faster but harder on the steel, and the industry-typical distance reflects that trade rather than a hard rule.

Geometry decides where drilled lines stop working. The heat concentrates where steel surrounds plastic on all sides, and a straight hole cannot reach the middle of a tall core. The published options stack up as follows.

LayoutMechanism in one lineFits
Straight-drilled channelsGun-drilled lines through cavity and core platesFlat or gently curved surfaces, cores no deeper than wide
BaffleA blade splits the hole so coolant flows down one side and up the otherMedium-depth cores and slots
BubblerAn inner tube carries coolant to the core tip before it returns around the tubeDeep, narrow round cores and bosses
Copper-alloy insertA high-conductivity slug carries heat from a blind hotspot to a real circuitIsolated hot spots where no channel fits
Conformal channelsAdditively manufactured lines follow the cavity contourComplex geometry where drilled lines cannot follow

Two rows carry most of the weight. The core side owns roughly 80 % of the heat extraction on published mouldmaker figures, because the cooling part shrinks onto the core and pulls off the cavity. And bubblers earn their place precisely there: a working tooling engineer writing in Plastics Technology calls them the most effective way to cool tight areas and notes how often the option gets missed.

Copper alloy is a scalpel, not a replacement. Beryllium copper conducts at 105–130 W/(m·K) against roughly 29 for P20 tool steel, so an insert at a boss tip moves heat several times faster than the steel around it — but the insert still needs a water circuit at its back end to dump that heat into.

Conformal cooling sits last for a reason. It earns its cost premium only where geometry blocks every simpler option, and a mould that never needed it should not pay for it.

In our own assembly bay, every cooling circuit on a multi-cavity plate gets a flow-and-continuity check while the plate is still on the bench, before the tool closes for its first trial. A circuit that passes on the bench stays verifiable later; one that was never checked becomes a variable nobody can see.

Why does coolant flow beat channel count?

Water is the weak link in the chain. Standing water conducts heat about 50 times worse than P20 steel on the same comparison scale, so the mould can only dump heat as fast as the coolant carries it away — and that depends on flow state, not on how many holes exist.

The dividing line is turbulence. A Reynolds number above roughly 4,000–5,000 marks flow turbulent enough to scrub heat off the channel wall; below it, a laminar boundary layer insulates the water from the heat it is meant to collect. The published guidance for existing tools is blunt: diameter, resin and circuit length are fixed, so velocity — flow rate — is the only variable left, and it should be run as high as the circuit allows.

Steel choice bends the same curve. On the relative scale published by MoldMaking Technology, hardened H13 conducts roughly 15–20 % less heat than P20, and Plastics Technology states the same relationship for the same pair. A harder steel holds up against glass-filled resins better but needs slightly more cooling capacity behind it — a swap worth making consciously rather than by default.

One boundary belongs here. Raising flow helps until the circuit reaches good turbulence, after which extra flow buys little; and a circuit that runs hot because scale has narrowed the channels will underperform no matter what the pump delivers. Water treatment and circuit condition set the ceiling.

Limitations

Calculated floors differ from shop reality. The 9.8-second figure comes from a one-dimensional solution that assumes a flat plate, symmetrical cooling and a constant mould wall temperature. Real parts cool unevenly across thickness transitions, the mould surface temperature drifts during the cycle, and pack and ejection add time the formula never sees. Treat every calculated value here as a lower bound for comparison between designs, not as a cycle quote.

Third-party figures carry their own scope. The 50–70 % cycle share, the 80 % core-side heat share, the Reynolds threshold, the conductivity values and the channel-geometry ranges all come from industry media and manufacturing platforms, each measured under conditions those sources describe. Values shift with resin grade, coolant condition and steel hardness, and none of the numbers in this article was measured in our shop. Where two sources gave different thresholds — 4,000 against 5,000 for Reynolds — the range is stated rather than averaged.

What this means for your RFQ

Wall thickness is the cheapest cycle-time decision you own, and it is free until the steel is cut. A drawing review that flags the thickest section before tooling starts beats any amount of cooling hardware added afterwards. The checks below cost nothing to request and settle most cooling questions early:

  • Send the 3D file with wall thickness visible, and name the thickest section that must freeze before ejection.
  • Ask which areas the cooling layout treats as hot spots, and what reaches them — baffle, bubbler or conductive insert.
  • Ask that cooling circuits be checked for flow and continuity during plate assembly, before the tool closes for its first trial.
  • For glass-filled resins, ask which steel grade is planned for the cavity and how the cooling was sized for it.
ItemValue
Injection presses11 machines, 80–450 T clamping force
Tooling equipment5 CNC machining centres, EDM, grinding, copper electrodes
Assembly checkMulti-cavity plate inspection includes cooling-circuit verification
First articleBridge CMM dimension report with each trial
Resins mouldedPP, PE, ABS, PC, PA
QuotationReturned inside 24 hours once 2D/3D files land

Design, cutting, trials and CMM inspection stay inside one plant here, so a wall-thickness question raised at quotation gets answered by the team that will machine the steel — not passed between three suppliers.

Cooler cores | Shorter cycles | Stable parts. Send your 3D file to info@hongqiangmould.com and the review comes back with the quotation, within 24 hours.

Frequently asked questions

How much of an injection moulding cycle is cooling time? Published industry figures place the cooling stage at roughly 50–70 % of the total cycle for standard thermoplastic moulding. The exact share depends on wall thickness, resin and mould temperature, but cooling is nearly always the longest stage. Any serious cycle-time effort therefore starts with the cooling design rather than with the injection unit.

Does a thicker wall really multiply cooling time that much? Yes, because the formula carries wall thickness squared. Doubling the wall from 2.0 mm to 4.0 mm multiplies the calculated cooling floor by four, and even the step from 3.0 mm to 2.5 mm removes about a third of it. Wall changes act before any tooling exists, which makes them the least expensive cycle lever a designer controls.

Should a deep core use a baffle or a bubbler? For deep, narrow round cores, a bubbler usually wins: an inner tube delivers the coldest coolant directly to the core tip, where heat concentrates. A baffle suits wider, shallower features where a split flow gives enough coverage. Both need turbulent flow to work well, and a working tooling engineer writing in Plastics Technology rates bubblers as the most overlooked cooling option in tight areas.

Do copper alloy inserts replace normal cooling channels? No. Beryllium copper conducts three to four times better than P20 tool steel, but an insert only carries heat from a blind hotspot to the circuit behind it — it still needs water at its back to remove that heat. Copper inserts work best as targeted fixes at bosses and ribs, with drilled channels doing the bulk of the extraction.

Jack works on the tooling and molding team at Hongqiang Mould, an injection mould manufacturer and plastic injection molding supplier. The shop runs 11 presses from 80 to 450 T, 5 CNC machining centres and a metrology room with bridge CMM inspection.


Technical Guides

Browse all technical guides →

/* data-no-optimize is REQUIRED: LiteSpeed rewrites plain inline scripts to type="litespeed/javascript", which browsers never execute. This site's existing inline scripts already use the same attribute. */